
Size: 46/48

You will need: 285 g of Adelia “CLAIRE” yarn (50 % acrylic, 50 % wool; 138 m/50 g) light green; 100 g of Adelia “CLAIRE” yarn (50 % acrylic, 50 % wool; 138 m/50 g) green-yellow color; hook No. 2.5.
Knitting technique.
Elastic band 1×1: alternately 1 concave st. s/n, 1 convex st. s/n.
Hexagonal motif (304 pcs.): Using light green (green-yellow) yarn, cast on a chain of 6 chains. n. and close the connection in a circle. Art.
1st row: 3 air. p. lifting, 2 tbsp. s/n into the resulting ring, 2 air. p., * 3 tbsp. s/n in the ring, 2 air. p. *, repeat from * to * 4 times, 6 times in total. Row finish connection. Art.
2nd row: 3 air. lifting point, 1 tbsp. s/n in 1st air. lifting point, 1 tbsp. s/n in the next st. s/n of the previous row from the hook, 2 tbsp. s/n in the next st. s/n of the previous row from the hook, 3 air. p., * 2 tbsp. s/n in the next st. s/n of the previous row from the hook, 1 tbsp. s/n in the next st. s/n of the previous row from the hook, 2 tbsp. s/n in the next st. s/n of the previous row from the hook, 3 air. p. *, repeat from * to * 4 times, 6 times in total. Row finish connection. Art.
Thus, complete 112 green-yellow motifs and 192 light green motifs.

Pentagonal motif (54 pcs.): Using green-yellow yarn, cast on a chain of 6 air. p. and close the connection in a circle. Art.
1st row: 3 air. p. lifting, 2 tbsp. s/n into the resulting ring, 2 air. p., * 3 tbsp. s/n in the ring, 2 air. n. *, repeat from * to * 3 times, 5 times in total. Row finish connection. Art.
2nd row: 3 air. lifting point, 1 tbsp. s/n in 1st air. lifting point, 1 tbsp. s/n in the next st. s/n of the previous row from the hook, 2 tbsp. s/n in the next st. s/n of the previous row from the hook, 3 air. p., * 2 tbsp. s/n in the next st. s/n of the previous row from the hook, 1 tbsp. s/n in the next st. s/n of the previous row from the hook, 2 tbsp. s/n in the next st. s/n of the previous row from the hook, 3 air. n. *, repeat from * to * 3 times, 5 times in total. Row finish connection. Art.

Knitting density: 25 Art. s/n x 10 rub. = 10 x 10 cm
DESCRIPTION OF WORK
Whole knitted back and front (bodice): 76 зелёно-жёлтых мотивов и 72 светло-зелёных мотива соединить между собой в последнем ряду по схеме соединения мотивов для переда и спинки.
Присоединить пряжу светло-зелёного цвета за нижнюю часть и вязать по кругу ст. с/н.
Всего 172 ст. с/н.
Ряд закончить с помощью соед. ст. Нить не отрезать.
Присоединить пряжу зелёно-жёлтого цвета и вязать по кругу резинкой 1х1.
Ряд закончить с помощью соед. ст. Нить не отрезать.
Далее вязать по кругу 9 рядов резинкой 1х1 чередуя цвета нитей в каждом ряду.
Каждый ряд заканчивать с помощью соед. ст. Пряжу зелёно-жёлтого цвета отрезать.

Whole knitted back and front (skirt): вязать пряжей светло-зелёного цвета 40 рядов ст. с/н. Каждый ряд заканчивать с помощью соед. ст.
Для расширения юбки в 11-м ряду от начала работы равномерно прибавить 24 ст. с/н, затем в каждом 10-м ряду 1 раз 20 ст. с/н.
В работе = 216 ст. с/н.
Wedge (6 pcs.): Knit each wedge separately in straight and reverse rows.
1st row: 3 air. lifting point, 35 tbsp. s/n in the next 35 st. s/n of the previous row.
2nd and all subsequent rows: knit st. s/n, knitting 2 unfinished sts at the beginning and end of each row. s/n together. In work = 0 tbsp. s/n.
Assembly.
Wedge of motifs (6 pcs.): 9 пятиугольных мотивов, 6 зелёно-жёлтых шестиугольных мотивов и 10 светло-зелёных шестиугольных мотивов соединить между собой в последнем ряду по схеме соединения мотивов для клина.
Готовые клинья из мотивов присоединить к клиньям юбки по фото.
По низу юбки присоединить оставшиеся светло-зелёные мотивы.

Skirt bottom binding: attach green-yellow yarn and knit in the round as follows: * 1 tbsp. b/n, arch of 3 air. p., 2 tbsp. s/n at the base of art. b/n *, repeat from * to * until the end of the row. Finish the row using conn. Art.
Neck line tie in a circle as follows:
1st row: join green-yellow yarn and knit st. s/n. Finish the row using conn. Art. Cut the thread.
2nd row: join light green yarn, * 1 tbsp. b/n in the 2nd art. s/n of the previous row from the hook, arch of 3 air. p., 2 tbsp. s/n at the base of art. b/n *, repeat from * to * until the end of the row. Finish the row using conn. Art.
Bottom of sleeves tie in a circle as follows:
1st row: join light green yarn and knit st. s/n. Row finish connection. Art. Cut the thread.
2nd row: join green-yellow yarn, * 1 tbsp. b/n in the 2nd art. s/n of the previous row from the hook, arch of 3 air. p., 2 tbsp. s/n at the base of art. b/n *, repeat from * to * until the end of the row. Finish the row using conn. Art.

Related posts
About the Author

Welcome !
My name is Lilia. The main hobby of my life is knitting. I started with knitting needles and switched to a knitting machine. In 1988 I got acquainted with crochet - Romanian lace. About 10 years ago I became interested in Irish lace and Shetland knitting. And now I’m trying fillet crochet. On this site I want to share with you my 45 years of experience in various knitting techniques.
Latest publications
Джемпер с крупным ажурным узором спицами
Изящный, почти кружевной узор хорошо сочетается с широкими планками на рукавах и по нижнему краю, связанными резинкой. Более узкая бейка горловины красиво лежит вокруг шеи.
Джемпер Оверсайз — Summer Diamond
The jumper is knitted in straight rows from top to bottom, with the back and front separated. The back is longer than the front. The sleeves are knitted from the armholes, sewn together at the back and front.
Пуловер реглан PATRIZIA
Джемпер Lapsk sommar
Blog Subscription
Be the first to receive new items!